Status of modules in each TEC center
Files produced (updated each day at 01 AM)
(all above files are .txt and can be opened directly using Excel or OpenOffice)
Conditions to be in the list of modules ready for Petal Integration 
To be in the list of modules available for Petal Integration, the following conditions are required:
-
status should not be faulty
-
version should not be 99
-
there should be a flag for each actions: gantry, bonding and ARC test (validation); this flag should not be negative
-
the module may be affected by any of the folllowing "known problems":
- Pitch overlap on sensor
- Repaired R-bias problem
- Bad 2D label position
- Repaired bad 2D label position
- recycled sensor (recuperated from faulty module)
Query used to produce the files
-
You can download this query and run it yourself. Please edit the query and replace
'center_name_to_be_replaced' by your 'institute_name' (as written just above)
-
You need to have the relay.pl application installed. You can download this
application direclty from: Thomas bergauer's web page
-
the command line to run the query will be something like: relay.pl path_to_the_query/query_modules_generic.sql > path_for_result/output_name.txt